Thanks to Paul Creed and Chris Mason for these pics showing dock work. The B dock has been cut loose and floated away. New docks are being assembled in the parking lot. We’re trying a new method of dredging, and you’ll see the big, green diesel power unit for the dredge pump being moved into position on the launch ramp.
Haul Out 2017 Gallery
Haul-Out Postponed
Haul-out has been postponed a week due to weather. The new date is Saturday, October 21.
See the details on the event page.
Sorry for the inconvenience, but with thunderstorms in the forecast, safety comes first.
You must be logged in to post a comment.