Travelift Launch Pit Construction
The Travelift project is zooming right along. Steel was purchased and delivered, the site was excavated, I-beams were drilled and sunk in the ground. Concrete was poured on December 7, 2022 about 88 yards of concrete weighing approx 350,000 pounds! The sketch at the bottom shows the next phase of the project, where steel runways will extend out into deeper water.
You must be logged in to post a comment.