Posted on 01/26/201604/29/2019 by SRYC Comms TeamProgress on the Lower Level Floor The crew is hard at work on the lower level floor. This Mighty Machine draws 220 volts. The project will require several passes over the floor. Related
You must be logged in to post a comment.